| 
 | ||
Metal processing
|   | SdsMax produce automatcally point for pneumatic drill. 
 Every 8 seconds a point is terminated. 
 First the sistem load the steel bars. | 
| 
 
 
 The bars are cutted at the right longer. | 
 | 
|   | 
 
 
 Second is gived the finishing touch at the extremity | 
| The system realized the grooving for the connection in the pneumatic drill. | 
 | 
|   | 
 The other extremity is heated at 800°C. At this temperature the extremity is hammered for giving the final aspect. | 
| 
 
 
 This video show SdsMax during costruction. |   
 |